Projects
Energy

Energy Analysis and Sustainable Design of the Faculty of Basic Sciences – Razi University, Kermanshah

Thermal Performance Simulation Using DesignBuilder Software

Project Overview

Location:
Razi University, Kermanshah, Iran
Project Type:

Educational Building- Thermal Optimization & Passive Design

Year:
2024
Status:
Completed
Client:
Razi University of Kermanshah
Architect & Energy Specialist:
Dr. Amirhossein Janzadeh

Project Introduction

The Faculty of Basic Sciences building at Razi University is located in a mountainous region with a cold climate. The architectural form, optimal orientation, and performance-based design approach provided a solid foundation for integrating energy-focused interventions.
The project aimed to reduce energy consumption, enhance thermal comfort, and improve environmental sustainability. Within the framework of economic and construction constraints, a set of cost-effective yet impactful solutions were designed and implemented within the existing structure.

Razi University designbuilder plan - Rymast Architecture Studio
Ground Floor 01 - Rymast Architecture Studio
Ground Floor 02 - Rymast Architecture Studio

The Role of DesignBuilder in Energy Analysis

A set of clear sustainability and energy-efficiency targets guided the project’s design and engineering decisions.

These objectives shaped the selection of materials, systems, and passive strategies throughout the process:

  • 37% reduction in total building energy consumption
  • Improved thermal comfort for users in educational spaces
  • Lower electricity and natural gas usage
  • Reduced CO₂ emissions and environmental footprint
  • Increased lifespan of mechanical systems and lower long-term operational costs
  •  

The Role of DesignBuilder in Energy Analysis

Comprehensive energy simulations were carried out using DesignBuilder, a powerful software platform built on the EnergyPlus engine. It enabled accurate thermodynamic modeling of the building’s performance throughout the year, under real climatic conditions.

Key applications of DesignBuilder in this project included:

  • Creating a detailed, three-dimensional digital model of the building
  • Performing accurate calculations for heating, cooling, ventilation, and daylighting loads
  • Simulating and comparing multiple optimization scenarios and their impact on energy use and CO₂ emissions
  • Assessing the performance of the building envelope, materials, shading systems, and mechanical equipment
  • Documenting quantitative outcomes of each phase for reporting and decision-making

DesignBuilder proved to be a crucial tool for predicting and validating the effectiveness of proposed design strategies before implementation, supporting a data-driven and scientific design process.

دانشکده علوم دانشگاه رازی کرمانشاه-Rymast
Razi University designbuilder render1 - Rymast Architecture Studio

Design Approach and Energy-Focused Interventions

The design approach for this project was shaped around enhancing thermal performance and reducing the building’s energy consumption. The proposed interventions included the use of high thermal resistance materials, the installation of low-emissivity double-glazed windows, the integration of fixed shading devices on the south-facing façade, and the incorporation of a heat recovery system within the HVAC.
These measures were evaluated through multiple simulation scenarios and phases to quantitatively assess their effects on heating and cooling loads, gas and electricity usage, occupant thermal comfort, and the reduction of greenhouse gas emissions.
The simulation outcomes enabled informed, data-driven decision-making and the selection of the most cost-effective practical solutions. The results clearly showed that even straightforward interventions can yield meaningful improvements in a building’s energy performance.

Thermal Optimization Strategy- Four Phases of Simulation and Intervention

1) Phase 1; Base Case Scenario

In this phase, the building was analyzed in its original, unoptimized condition to establish a baseline for comparison.

  • Observed Issues:
    – Absence of proper wall insulation
    – Single-glazed windows without Low-E coating
    – No shading devices on the southern façade
    – No heat recovery in the HVAC system

  • Simulation Findings:
    – Extremely high heating and cooling loads
    – Heavy reliance on electricity for cooling and gas for heating
    – Significant energy loss through the building envelope
    – High CO₂ emissions
  •  
P4 - Rymast Architecture Studio
P1 - Rymast Architecture Studio

2) Phase 2; Enhanced Building Materials

Two key upgrades were implemented: 3 cm polystyrene insulation was added to interior walls, and double-glazed Low-E windows were installed.

  • Outcomes:
    – Improved thermal resistance of the building envelope
    – Reduced heat loss in winter
    – Enhanced indoor comfort without increased reliance on HVAC systems
    – Considerable reduction in heating demand and natural gas consumption
P2 - Rymast Architecture Studio
P22 - Rymast Architecture Studio

3) Phase 3; Shading on the Southern Façade

Fixed horizontal shading devices were installed on the southern façade to reduce solar heat gain.

  • Key Benefits:
    – Controlled direct solar radiation during summer
    – Improved thermal and visual comfort in learning spaces
    – Lower peak cooling loads
    – Reduced electricity use by cooling systems
P33 - Rymast Architecture Studio
P3 - Rymast Architecture Studio

4) Phase 4; Heat Recovery System Integration

A heat recovery system was integrated into the mechanical ventilation setup. By reclaiming heat from exhaust air, the system preheats incoming fresh air, increasing overall efficiency.

  • Results:
    – Significant reduction in winter heating loads
    – Notable savings in natural gas usage
    – Improved performance of the HVAC system
    – Decrease in annual CO₂ emissions
P444 - Rymast Architecture Studio
P4444 - Rymast Architecture Studio
P44 - Rymast Architecture Studio
P11 - Rymast Architecture Studio

Conclusion

This project serves as a successful example of integrating digital energy modeling, optimized materials, and simple passive design strategies to achieve sustainable outcomes. Despite a limited budget, the proposed measures led to substantial improvements in the building’s thermal performance.

Key Achievements:

  • 37% reduction in total annual energy consumption
  • Marked decrease in greenhouse gas emissions
  • Enhanced thermal comfort in educational spaces
  • Alignment with sustainable development goals for higher education infrastructure

This initiative offers a practical and replicable model for retrofitting existing educational buildings in cold climates across Iran.


For consultation and energy management services tailored to your project, feel free to get in touch.